Fiyrr Brand Terminal Icon Fiyrr
Video Guide Sign In Request Demo
FI-500 / SOLUTIONS

Configured for how your organisation actually delivers projects.

The suite is the same — approval chains, cost structures and field workflows are configured differently depending on who you are on the project.

FI-501 / GENERAL CONTRACTORS

Run every active site from one control tower.

With ten, twenty or fifty live projects, a GC's head office needs consistent status without waiting on each site to compile a report. Fiyrr standardises how every project reports schedule, cost and quality — so a portfolio view is a query, not a Friday phone round.

  • Standardised daily reporting across all sites
  • Portfolio-level cost and schedule roll-up
  • Subcontractor management on a shared document register
Talk to Us
SHEET — PORTFOLIO
12 ACTIVE SITESWEEK 22
Site 04 — Riverside TowerOn Track
Site 07 — Northgate Mall2 Open RFIs
Site 09 — Harborline Phase 2Cost Review
SHEET — PORTFOLIO COST
ProjectBudgetForecast
Riverside Tower₹184 Cr₹181 Cr
Northgate Mall₹96 Cr₹99 Cr
Harborline P2₹212 Cr₹214 Cr
FI-502 / REAL ESTATE DEVELOPERS

Portfolio-level visibility, without chasing your GC weekly.

Developers need cost and schedule confidence across a portfolio their contractors are actually delivering. Fiyrr gives developers a read-only, always-current view of every project's schedule and budget status, sourced directly from the GC's own project record.

  • Live budget vs. forecast across every project
  • Independent visibility into schedule risk
  • Document access for lender and investor reporting
Talk to Us
FI-503 / INFRASTRUCTURE & EPC

Built for long-cycle, multi-contractor works.

Infrastructure and EPC projects run for years, across multiple contractors and design consultants, with heavy documentation and regulatory obligations. Fiyrr's document control and RFI routing are built to hold that complexity without collapsing into a shared drive.

  • Multi-contractor document distribution controls
  • Long-cycle schedule baselines with re-baseline history
  • Configurable approval chains for regulatory submittals
Talk to Us
SHEET — DOC REGISTER
REGULATORY SUBMITTALSPHASE 2
Environmental clearance — Rev 3Approved
Structural design packageUnder Review
Utility relocation permitPending
FI-504 / SUBCONTRACTORS

Stay in scope, on schedule, and get paid on time.

Subcontractors get a scoped view of exactly what they need — their look-ahead, their current drawings, their open RFIs and their punch items — without wading through a GC's full project record.

Scoped look-ahead

See only the activities and zones relevant to your trade, always current.

Current drawings only

No superseded sheets — document control keeps your set current automatically.

Punch items, pinned and clear

Every closeout item pinned to a location, with a clean record of what you've closed.

Tell us how your projects run.

We'll show you Fiyrr configured close to your own project structure.

Request a Demo