Fiyrr Brand Terminal Icon Fiyrr
Video Guide Sign In Request Demo
FI-PCH / PUNCH.FIYRR.COM

Every defect pinned to the plan — closed out to a clean handover.

Fiyrr Punch List turns snagging into a pinned, assignable record on the actual drawing, tracked to closure with photo evidence — so handover isn't a scramble to find who fixed what.

PinnedEvery Item on the Plan
AutoAssignment by Trade
One-ClickHandover Certificate
SHEET — PCH-L09FLOOR 9 SNAG LIST
Paint touch-up — Unit 09-04Open
Door hardware — Unit 09-02Fixed, Pending QA
Tile grout — Unit 09-07 bathClosed
Skirting gap — Corridor 9Open
Window seal — Unit 09-01Closed
FI-PCH / CAPABILITIES

Snagging that closes out on evidence, not a checkbox

Every item pinned to a location, assigned to the responsible trade, and verified before it closes.

01 / PIN TO PLAN

Defects marked on the exact drawing location

Punch items pin to the specific unit, zone or drawing coordinate they were raised against — no ambiguity on location.

02 / TRADE ASSIGNMENT

Routed to the responsible subcontractor automatically

Items assign directly to the trade responsible, with due dates and photo evidence attached at creation.

03 / VERIFIED CLOSEOUT

Fixed doesn't mean closed until QA confirms it

A two-step closeout — marked fixed by the trade, verified by the site team — before an item counts as resolved.

04 / HANDOVER CERTIFICATE

A clean, exportable record at project close

Once all items close, a handover certificate compiles automatically from the verified punch record.

FI-PCH / WORKFLOW

How a punch item moves from raised to closed

A short cycle that leaves a clean, verifiable trail.

01

Raise & pin the item

An item is raised with a photo and pinned to its exact location on the plan.

02

Assign to the trade

The item routes to the responsible subcontractor with a due date.

03

Mark fixed, then verify

The trade marks it fixed; the site team verifies with photo evidence before closeout.

04

Compile the handover record

Closed items compile into a certificate ready for client handover.

FI-PCH / CONNECTED

Works with the rest of the suite

Punch items reference drawings from Document Control and often originate from findings in Quality & Safety inspections.

FI-QS

Quality & Safety

Failed inspection findings convert directly into punch items.

Open module →
FI-DOC

Document Control

Every pin references the current controlled drawing.

Open module →
FI-BIM

Drawings & BIM

Items can be pinned against a coordinated 3D view.

Open module →
FI-PCH / FAQ

Frequently asked questions

Can clients view the punch list directly?

Yes — a scoped, read-only view can be shared with clients to track closeout progress without full project access.

Does a subcontractor get notified when assigned?

Yes — assignment triggers a notification with the item, location and due date.

Can we export the handover certificate?

Yes — once verified and closed, the full punch record exports as a handover-ready document.

See Punch List & Snagging on your own project.

We'll load a sample of your drawings, schedule or cost data into the demo.

Request a Demo