Fiyrr RFI & Submittals routes requests for information and submittal packages through their full approval chain, with a live ball-in-court indicator so nobody has to ask "who has this now?"
RFIs and submittals that show exactly who is holding them up, in real time.
Raise an RFI against a specific sheet and zone, with automatic routing to the right discipline for response.
Submittal packages move through review with configurable approval stages — no more parallel email threads.
A live indicator shows exactly which party — architect, engineer, contractor — currently owns the next action.
RFIs approaching their required-by date are flagged against the schedule activity waiting on the answer.
A structured path that keeps every party accountable for their turn.
An RFI is raised referencing the exact sheet, zone and controlled revision.
The RFI routes automatically to the discipline responsible for the response.
Status updates as the RFI moves between reviewer, contractor and design team.
The closed RFI and its answer are logged permanently against the drawing it referenced.
RFIs reference the controlled drawing in Document Control and flag risk directly on the Schedule when responses run late.
RFIs and submittals always reference the current controlled revision.
Open module →Yes — approval stages are configurable per submittal category, e.g. shop drawings vs. product data.
Yes — RFIs approaching their required-by date notify the current ball-in-court holder and the project lead.
Yes — the full RFI and submittal log exports with status, dates and linked drawings.
We'll load a sample of your drawings, schedule or cost data into the demo.