Fiyrr
Fiyrr connects schedule, documents, materials, cost, quality and field reporting into a single project record — so nothing gets tracked twice, and nothing falls through a spreadsheet.
Trusted on site by
Every Fiyrr product runs on its own dedicated workspace — built for how that discipline actually works on site — and reads from the same underlying project record.
Build, sequence and present the master schedule — with live look-aheads pulled straight from the field.
Open moduleOne controlled register for drawings, specs and transmittals, with revision history and distribution logs.
Open moduleTrack every material from PO to pour — supplier lead times, deliveries, and site stock in one ledger.
Open moduleBudgets, change orders and cost-to-complete rolled up against the schedule in real time.
Open moduleChecklists, inspections and safety observations, closed out against the drawing they reference.
Open moduleRoute RFIs and submittals with approval chains and ball-in-court tracking that never goes quiet.
Open moduleFederate models, mark up sheets and resolve clashes without leaving the project record.
Open moduleDaily logs, labour counts, weather and site photos captured from a phone in under two minutes.
Open modulePin defects to the plan, assign, and track closeout to a clean handover certificate.
Open modulePlan crews and equipment against the schedule and see utilisation before it becomes a clash.
Open moduleMost project software is built for the head office. Fiyrr is built for the person walking the slab with a phone in one hand and a drawing roll in the other — and it feeds the head office from there.
Schedule slippage, a late material delivery and an open RFI on the same wall show up on the same drawing — because they're the same record, not three disconnected tools stitched together with CSVs.
Daily logs, punch items and material receipts are captured where the work happens, offline if needed, and sync the moment there's signal — no re-typing into a desktop system that evening.
Document control isn't a shared folder. Superseded sheets are locked, distribution is logged, and every submittal carries its approval chain — so nobody builds off Rev B when Rev C exists.
Approval chains, cost codes, checklist formats and reporting cycles are configured to match how your organisation already runs projects — implementation adapts Fiyrr to you.
A structured rollout, run alongside your implementation engineer — not a self-serve wizard you're left to figure out.
Cost codes, WBS, drawing sets and approval chains are mirrored into Fiyrr during a working session with your PMO.
Current schedule, open RFIs, submittal logs and material POs are imported so day one starts where you actually are.
Foremen, engineers and the PMO are trained on the same project data, in the same week, so adoption happens once.
Your implementation engineer stays assigned through the first two reporting cycles, then hands off to support.
We stopped reconciling three versions of the schedule every Monday. The look-ahead in Fiyrr already reflects what field reported Friday evening — that alone paid for the rollout.
30-minute walkthrough, configured with your project types and cost structure.