Fiyrr Brand Terminal Icon Fiyrr
Video Guide Sign In Request Demo
FI-000 / PROJECT CONTROL SUITE

Every construction site, on one set of drawings that talk to each other.

Fiyrr connects schedule, documents, materials, cost, quality and field reporting into a single project record — so nothing gets tracked twice, and nothing falls through a spreadsheet.

10Connected Modules
1,200+Active Sites
18M+Sq. Ft. Tracked
4.7Field Team Rating
SHEET — SCH-04WEEK 22 LOOK-AHEAD
RCC — Tower B, L14 slab pourOn Track
Façade glazing — Tower ADelayed 2d
MEP first fix — L09–L11In Progress
RFI-0142 — Column grid C4Awaiting Reply
Rebar delivery — PO 8821Confirmed

Trusted on site by

Vantage Builders Meridian Infra Northgate Realty Ashford EPC Kestrel Contracting Harborline Developments
FI-100 / THE SUITE

One project. Ten modules. Zero re-entry.

Every Fiyrr product runs on its own dedicated workspace — built for how that discipline actually works on site — and reads from the same underlying project record.

FI-SCH — SCH.FIYRR.COM

Schedule Management & Presentation

Build, sequence and present the master schedule — with live look-aheads pulled straight from the field.

Open module
FI-DOC — DC.FIYRR.COM

Document Control

One controlled register for drawings, specs and transmittals, with revision history and distribution logs.

Open module
FI-MAT — MATERIAL.FIYRR.COM

Material Procurement Tracking

Track every material from PO to pour — supplier lead times, deliveries, and site stock in one ledger.

Open module
FI-CST — COST.FIYRR.COM

Cost & Budget Management

Budgets, change orders and cost-to-complete rolled up against the schedule in real time.

Open module
FI-QS — QS.FIYRR.COM

Quality & Safety Management

Checklists, inspections and safety observations, closed out against the drawing they reference.

Open module
FI-RFI — RFI.FIYRR.COM

RFI & Submittals

Route RFIs and submittals with approval chains and ball-in-court tracking that never goes quiet.

Open module
FI-BIM — BIM.FIYRR.COM

Drawings & BIM Coordination

Federate models, mark up sheets and resolve clashes without leaving the project record.

Open module
FI-FLD — FIELD.FIYRR.COM

Field Reporting & Daily Logs

Daily logs, labour counts, weather and site photos captured from a phone in under two minutes.

Open module
FI-PCH — PUNCH.FIYRR.COM

Punch List & Snagging

Pin defects to the plan, assign, and track closeout to a clean handover certificate.

Open module
FI-RES — RESOURCE.FIYRR.COM

Resource & Labour Management

Plan crews and equipment against the schedule and see utilisation before it becomes a clash.

Open module
FI-200 / WHY FIYRR

Built for the site, not the spreadsheet.

Most project software is built for the head office. Fiyrr is built for the person walking the slab with a phone in one hand and a drawing roll in the other — and it feeds the head office from there.

01 / SOURCE OF TRUTH

One project record, not ten exports

Schedule slippage, a late material delivery and an open RFI on the same wall show up on the same drawing — because they're the same record, not three disconnected tools stitched together with CSVs.

02 / BUILT FOR SITE

Field-first, office-second

Daily logs, punch items and material receipts are captured where the work happens, offline if needed, and sync the moment there's signal — no re-typing into a desktop system that evening.

03 / CONTROLLED, NOT CHAOTIC

Every drawing, every RFI, one revision history

Document control isn't a shared folder. Superseded sheets are locked, distribution is logged, and every submittal carries its approval chain — so nobody builds off Rev B when Rev C exists.

04 / CONFIGURED, NOT BOXED-IN

Fits your SOPs, not the other way round

Approval chains, cost codes, checklist formats and reporting cycles are configured to match how your organisation already runs projects — implementation adapts Fiyrr to you.

FI-300 / GETTING STARTED

Live on your first project in three weeks.

A structured rollout, run alongside your implementation engineer — not a self-serve wizard you're left to figure out.

01

Map your project structure

Cost codes, WBS, drawing sets and approval chains are mirrored into Fiyrr during a working session with your PMO.

02

Migrate the live record

Current schedule, open RFIs, submittal logs and material POs are imported so day one starts where you actually are.

03

Train site and office together

Foremen, engineers and the PMO are trained on the same project data, in the same week, so adoption happens once.

04

Go live, with a named engineer on call

Your implementation engineer stays assigned through the first two reporting cycles, then hands off to support.

FI-400 / FROM THE FIELD
We stopped reconciling three versions of the schedule every Monday. The look-ahead in Fiyrr already reflects what field reported Friday evening — that alone paid for the rollout.
Planning Head, Vantage Builders 42-storey residential tower, Tower B & C

See Fiyrr on a project like yours.

30-minute walkthrough, configured with your project types and cost structure.

Request a Demo